Member area

User login

Enter your username and password here in order to log in on the website:

Login failure

An error occurred during login. Most likely you didn't enter the username or password correctly.

Be certain that you enter them precisely as they are, including upper/lower case.

Another possibility is that cookies might be disabled in your web browser.

About us

We are delighted to introduce you to a few facilities which are equipped with Häny systems.

[Translate to English:] Übersicht Tunnel- und Bautechnik

Overview of reference properties

Category:Tunnelling and construction technology
[Translate to English:]

Main drainage - Semmering Base Tunnel SBT 3.1

Category:Tunnelling and construction technology
[Translate to English:]

Main drainage - Semmering Base Tunnel SBT 2.1

Category:Tunnelling and construction technology
[Translate to English:] Koralmtunnel – KAT 2

Koralmtunnel – CAT 2

Application:Cooling water supply to two tunnel boring machines
Customer:Koralm Tunnel Consortium (Strabag, Jäger Bau)
Time period:2012-2014
[Translate to English:] Koralmtunnel – KAT 2

Koralmtunnel – CAT 2

Application:Delivery of various wastewater pumps
Customer:ARGE Koralmtunnel (Strabag, Jäger Bau)
Time period:2012-ongoing
[Translate to English:] Semmering Basistunnel BL 2.1 – Fröschnitzgraben

Semmering Base Tunnel BL 2.1 – Fröschnitzgraben

Application:Drainage of two vertical shafts with a depth of 420m each
Customer:Swietelsky Tunnelbau
Time period:2015-2016
[Translate to English:] Semmering Basistunnel BL 2.1 – Fröschnitzgraben

Semmering Base Tunnel BL 2.1 – Fröschnitzgraben

Application:Supply of various waste water pumps for cyclic tunnel driving
Customer:Fröschnitzgraben Tunnel Consortium
Time period:2016
[Translate to English:] Semmering Basistunnel SBT 3.1

Semmering Base Tunnel SBT 3.1

Application:Water supply for drilling and blasting and mixing plant
Customer:SBT 3.1 Grautschenhof Consortium (Marti GmbH, Marti Tunnelbau AG)
Time period:2016
[Translate to English:] Brenner Basistunnel – Erkundungsstollen

Brenner Base Tunnel – Exploratory Tunnel

Application:Water supply to BE area and drilling and blasting
Customer:Tulfes Pfons Consortium (Strabag, Salini Impregilo)
Time period:2015